The Factors Affecting Human Resources Productivity in Urban Construction Projects A Comparison of Relative Importance Index and Fuzzy Logic Methods
- Department Civil Engineering-Engineering and Construction Management, Islamic Azad University, Arak, Iran
- Department of Civil Engineering, Collage of Engineering, Arak Branch, Islamic Azad University, Arak, Iran
- Department of Civil Engineering, University of Ayatollah Ozma Borujerdi, Iran.
- Department of Industrial Engineering, Arak Branch, Islamic Azad University, Arak, Iran.
Revised: 2023-07-31
Accepted: 2023-10-06
Published in Issue 2023-09-01
How to Cite
Yarahmadi, M., Mirhoseini, M., Komasi, M., & Ehsanifar, M. (2023). The Factors Affecting Human Resources Productivity in Urban Construction Projects A Comparison of Relative Importance Index and Fuzzy Logic Methods. Fuzzy Optimization and Modeling Journal (FOMJ), 4(3), 54-71. https://doi.org/10.30495/fomj.2023.1992756.1106
PDF views: 222
10.30495/fomj.2023.1992756.1106