Creative Method for Cash Flow Designing of Urban Construction Projects Using Break-Even Point
- Department of Civil Engineering, Taft.C., Islamic Azad University, Taft, Iran
- Department of Civil Engineering, Ma.C., Islamic Azad University, Mashhad, Iran
Received: 2025-04-12
Revised: 2025-09-23
Accepted: 2025-09-29
Published in Issue 2025-12-31
Copyright (c) 2026 Pouria Ildarabadi, Javad Alamatian, Mohammadreza Javaheri Tafti (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
PDF views: 18
Abstract
Aims: This study aims to establish a structured analytical framework that integrates macroeconomic variables specifically inflation, expected profit margins, cost components, advance payments, and payment schedules into a unified profitability assessment model. The central objective is to provide a more accurate and uncertainty-informed foundation for financial decision-making, addressing the shortcomings of traditional deterministic cash-flow approaches widely used in the construction industry.
Methodology: The research employs Monte Carlo simulation framework specifically tailored to model the stochastic nature of economic indicators affecting construction project cash flows. Probabilistic distributions derived from historical inflation and cost data are used to generate a realistic spectrum of economic scenarios. The methodology incorporates inflation-adjusted cash-flow calculations to preserve the time value of money and embeds break-even analysis to identify profitability thresholds under varying conditions.
Findings: The simulation results demonstrate that excluding inflation and expected profit margins during contractual and financial planning leads to systematically distorted profitability estimations. Such omissions increase the likelihood of cash-flow deficits, reduced net margins, and elevated financial risk throughout the project lifecycle. The proposed model captures variability and stress points that deterministic analyses fail to identify, revealing that financial exposure is significantly higher under realistic economic fluctuations. The integration of probabilistic modeling with inflation-adjusted cash-flow analysis enables a more robust understanding of risk patterns and strengthens the contractor’s capacity to manage liquidity and capital allocation.
Conclusion: This research offers a comprehensive and methodologically advanced framework for profitability assessment in construction projects, combining break-even analysis with Monte Carlo simulation grounded in empirical economic behavior. The proposed approach enhances the reliability of financial forecasts and provides meaningful guidance for contractors within economically volatile environments. Although its effectiveness depends on forecast quality and computational capacity, the framework marks a substantive improvement over conventional financial evaluation techniques and contributes to more resilient economic planning and decision-making in construction project management.
Keywords
- Cash Flow,
- Inflation Rate,
- Expected Rate,
- Monte Carlo simulation,
- Break-Even point,
- Financial Risk
References
- Hakimi M., Daneshvar A., Ehsanifar M., Nouri I. Utility evaluation of the sustainable suppliers of the construction industry with a new hybrid approach in conditions of uncertainty (case study: Kian Borj Company). JSCE, 2025; 11(12): 89-107. https://doi.org/10.22065/jsce.2024.447031.3370
- Ildarabadi P, Alamatian J. Proposing a new function for evaluation of the financial risk of construction projects using Monte Carlo method: Application on Iranian construction industry. Journal of Building Engineering 2021;43:103143. https://doi.org/10.1016/j.jobe.2021.103143
- Govan P, Damnjanovic I. Structural Network Measures for Risk Assessment of Construction Projects. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering 2020;6:04019024. https://doi.org/10.1061/AJRUA6.0001041
- Mao S, Xiao F. A novel method for forecasting Construction Cost Index based on complex network. Physica A: Statistical Mechanics and its Applications 2019;527:121306. https://doi.org/10.1016/j.physa.2019.121306
- Rezaie K, Amalnik MS, Gereie A, Ostadi B, Shakhseniaee M. Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties. Applied Mathematics and Computation 2007;190:1492-1501. https://doi.org/10.1016/j.amc.2007.02.038
- Lashkari E, Khalaj M. Reading of Developments in Comprehensive Urban Plans-Review of the Iranian Experience (Limitations and problems from Master Plan to Strategic-Structural Plan). Creative City Design 2019;2:15-23. https://oiccpress.com/crcd/article/view/7614
- Swei O. Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management 2018;144:04018058. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001511
- Assaf SA, Bubshait AA, Atiyah S, Al-Shahri M. The management of construction company overhead costs. International Journal of Project Management 2001;19:295-303. https://doi.org/10.1016/S0263-7863(00)00011-9
- Rafieian M, Asgary A, Asgarizadeh Z. Using A Choice Experiment to Measure the Development of Large Urban Redevelopment Projects: The Case of Tehran Urban Redevelopment Project. Creative City Design 2019;2:59-67. https://oiccpress.com/crcd/article/view/7602
- Sahabi f, Hanaei t. A Comparative Study of the Role of Integrated Urban Management in Local Economic Development: A Case Study of Iran and South Africa. Creative City Design 2020;3:55-64. https://oiccpress.com/crcd/article/view/7629
- Alavipour SMR. Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management 2019;26:118-138. https://doi.org/10.1108/ECAM-04-2018-0149
- Alavipour SMR, Arditi D. Optimizing Financing Cost in Construction Projects with Fixed Project Duration. Journal of Construction Engineering and Management 2018;144:04018012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001451
- Eghbal F, Ehsanifar M, Mirhosseini SM, mazaheri h. Using the Method of Simultaneous Assessment of Criteria and Alternatives (SECA) to Optimize the Evaluation of the Financial Performance of Iranian Construction Companies. Journal of Structural and Construction Engineering 2024. https://doi.org/10.22065/jsce.2024.450014.3378
- Lappe M, Spang K. Investments in project management are profitable: A case study-based analysis of the relationship between the costs and benefits of project management. International Journal of Project Management 2014;32:603-612. https://doi.org/10.1016/j.ijproman.2013.10.005
- Doughaei MM, Mahdinia M, Daneshvar M. A Comparative Study of Housing Planning in the Economic, Social, and Cultural Development Plans of Iran and Measuring their Efficiency Using the TOPSIS Model. Creative City Design 2023;6:90-99. https://oiccpress.com/crcd/article/view/7714
- Musarat MA, Alaloul WS, Liew MS, Maqsoom A, Qureshi AH. Investigating the impact of inflation on building materials prices in construction industry. Journal of Building Engineering 2020;32:101485. https://doi.org/10.1016/j.jobe.2020.101485
- Zhao N, Kam C, Jacqueline TYL, Kim Jung I, Fischer M. Construction Parts in Building Projects: Definition and Case Study. Journal of Management in Engineering 2018;34:04018014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000616
- Nowak AS, & Collins, K.R. . Reliability of Structures (2nd ed.). 2013. https://doi.org/10.1201/b12913
- Paek Joon H. Running a Profitable Construction Company: Revisited Break-Even Analysis. Journal of Management in Engineering 2000;16:40-46. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:3(40)
- Taheri S, Goudarzi M. Tariff-aware power management for reducing the break-even time of on-site solar power installation in data center. Renewable Energy Focus 2020;32:55-62. https://doi.org/10.1016/j.ref.2019.11.001
10.57647/j.ccd.2025.0804.23