Press Authors, OICC. 2023. “Beam Shaping Assembly Study for BNCT Facility Based on a 2.5 MeV Proton Accelerator on Li Target”. Journal of Theoretical and Applied Physics 12 (4). https://doi.org/10.1007/s40094-018-0312-1.